21 12 '18
Location: Lancaster, California Project Scope: Bare Liner Survey Date: May 2009 The total combined area surveyed for this project was approximately 12,880,000 square feet. The area was lined with a single smooth 60 mil HDPE geomembrane over a prepared subgrade. Any located leaks were marked, repaired and retested to verify no further damage was present. Due to…